[Case Study] Too much time (man-hours) is spent on blasting chemical processes.
The selection of projection materials is also very important! It solves issues such as "the blasting process is taking too much time"!
Although there is blasting equipment within the company, the reasons for its ineffectiveness include challenges such as "the blasting process takes too much time." The compressor pressure requires a minimum capacity of 15 kW per nozzle, and flow rate is also important during the blasting process. By using a larger air receiver in addition to the compressor, there is more flexibility for long processing times. Additionally, in blasting processes, whether the purpose is cleaning, surface preparation, or aesthetic quality, the choice of abrasive material is a crucial point depending on the required quality, and changing the abrasive material or its granularity can sometimes reduce work time. [Challenges] ■ The blasting process takes too much time. ■ We want to reduce the work hours of the blasting personnel. *For more details, please refer to the PDF document or feel free to contact us.
- Company:東洋ブラスト工業所 本社
- Price:Other